Archive of IJHRB


Archive of IJHRB


• Archive

• Search

Archive of IJHRB Search
SearchList 
(1) Select Keyword (2) Type a Keyword (3) Press Search
Vol. - No. Vol.7 - No.3
Date Aug., 2018
Title Significant Progress in Construction Equipment of Super High-Rise Building
Author Kun Zhang, Hui Wang, Kaiqiang Wang+, Jian Cui, Bo Chen, and Di Li
Institutions China Construction Third Engineering Bureau Group Co., Ltd, Wuhan, 430064, China
Abstract The construction of rapid developing super high-rise buildings constantly faces great challenges and the innovation of construction equipment is a focus of these challenges. In this paper, three new inventions including the operation platform, tower crane and hoist are put forward around two of the most important issues of super high-rise building construction: vertical transportation and operation environment. Study background, composition of the equipment, working principles and key
technologies are introduced in sequence. In the end, the paper summarizes the main problems in the further development of construction equipment.
Keyword Super high-rise building, Construction equipment, Vertical transportation, Integrated platform
PP. PP.243~253
Paper File Files(5879 kb) View

Contact Us

  • IJHRB - International Journal of High-Rise Buildings (ISSN 2234-7224)
  • The Secretariat, CTBUH Korea (Council on Tall Building and Urban Habitat Korea), #C 1101, 7, Beobwon-ro 11-gil, Songpa-gu, Seoul, 05836, Korea
  • TEL : +82-2-400-8136, FAX : +82-2-549-3745, E-Mail : ijhrb.ctbuhkorea@gmail.com
  • Copyright Council on Tall Building and Urban Habitat Korea. All Rights Reserved.