Archive of IJHRB


Archive of IJHRB


• Archive

• Search

Archive of IJHRB Search
SearchList 
(1) Select Keyword (2) Type a Keyword (3) Press Search
Vol. - No. Vol.7 - No.1
Date Mar., 2018
Title Realized Value Creation; New Construction in Constrained Urban In-fill Sites
Author Nathaniel C. Hadley1+ and Charles H. Thornton
Institutions 1 Pelli Clarke Pelli Architects (PCPA), 1056 Chapel Street, New Haven, Connecticut, 06511, USA
2 LIFT Group LLC., 10205 Kintore Drive, Easton, Maryland, 21601, USA
Abstract The Case Study prepared by PCPA and Lift Group will identify a growing development problem in urban areas; high value project sites that are restrictive in size or "tight" are underutilized and underdeveloped. In an effort to remedy this problem, our team will evaluate a design program through the lens of both conventional construction and Core Cantilever Construction.
It is also important to differentiate between Core Cantilever construction and the plagued "Lift Slab" construction method as they may be confused, due to the top down construction sequence. This article will demonstrate that constraints inherent to conventional construction techniques prohibit economically viable development of these project sites, while Core Cantilever construction methods increase the projects value by reducing construction timelines and increasing the useable floor area.
Keyword Constrained site, Core cantilever, Column free, "Just in time" delivery, BIM LOD 400
PP. PP.33~46
Paper File Files(11656 kb) View

Contact Us

  • IJHRB - International Journal of High-Rise Buildings (ISSN 2234-7224)
  • The Secretariat, CTBUH Korea (Council on Tall Building and Urban Habitat Korea), #C 1101, 7, Beobwon-ro 11-gil, Songpa-gu, Seoul, 05836, Korea
  • TEL : +82-2-400-8136, FAX : +82-2-549-3745, E-Mail : ijhrb.ctbuhkorea@gmail.com
  • Copyright Council on Tall Building and Urban Habitat Korea. All Rights Reserved.